Red Roof Inn Hotel Project

Short Description:

Super 8 is a globally recognized economy hotel brand under Wyndham Hotels & Resorts, focusing on practical design, cost efficiency, and guest comfort. To meet the brand’s renovation and new-build requirements, we provide complete Super 8 hotel furniture solutions for guestroom spaces.

We offer a one-stop guestroom furniture service, covering all essential case goods and loose furniture, including beds, headboards, desks, wardrobes, TV units, sofas, seating, and lighting. All products are manufactured in our factory and customized strictly according to Super 8 / Wyndham FF&E standards and individual project requirements.

With extensive experience in supplying hotel furniture for U.S. economy hotel projects, we ensure durability, consistency, and cost control, helping hotel owners and developers complete Super 8 projects efficiently and reliably.


Product Detail

Product Tags

We are a furniture factory in Ningbo,china. we specialize in making the American hotel bedroom set and hotel project furniture over 10 years.We will do a complete set of customized solutions according to customer needs.

2

Project Name:  Red Roof Inn hotel bedroom furniture set
Project Location: USA
Brand: Taisen
Place of origin : NingBo, China
Base Material: MDF / Plywood / Particleboard
Headboard: With Upholstery / No Upholstery
Casegoods: HPL / LPL / Veneer Painting
Specifications: Customized
Payment Terms: By T/T, 30% Deposit And The Balance Before Shipping
Delievery Way: FOB / CIF / DDP
Application: Hotel Guestroom / Bathroom / Public
Description:)1.Material: MDF+HPL+Veener paints+metal leg+304#S.S hardware
2.Place of Product:China
3.Colour:According to FFE
4.Fabric:Acoding to FFE,all fabric are Three anti-proof (waterproof, fireproof, anti- fouling)
5.Modes of packing: Foam corner+Pearl+cotton+Carton+ Wooden pallet

 

Our factory has meticulously designed and produced a series of high-quality furniture specifically for the Red roof inn hotel project, aiming to enhance the comfort and functionality of the hotel. Each piece of furniture is made from premium materials and complies with international standards, designed to offer long-lasting and durable solutions that meet the high demands of modern hotels.

Product Description

Item Description
Material MDF + HPL + veneer painting finish + metal legs + 304# stainless steel hardware
Place of Origin China
Color According to FF&E specifications
Fabric According to FF&E specifications; all fabrics are three-proof treated (waterproof, fire-resistant, anti-fouling)
Packing Method Foam corner protection + pearl cotton + carton packing + wooden pallet

Why Choose Us for Super 8 Projects

Advantage Description
U.S. Hotel Project Experience Extensive experience in U.S. budget hotel furniture projects
Brand Standard Familiarity Well-versed in Super 8 / Wyndham FF&E standards
Durability Strong construction designed for high-traffic guestrooms
Customization Capability Full customization of size, finish, materials, and fabrics
Quality Control Strict quality inspection at every production stage
Delivery & Support Stable lead time, professional export packing, and reliable after-sales support
FAQ
1.Had you supplied to US hotels?

- Yes, we are Choice Hotel Qualified Vendor and supplied a lot to Hilton, Marriott, IHG, etc. We did 65 hotel projects last year.If you are interested, we can send you some photos of projects.
2. How would you help me, I don’t have hotel furniture solution experience?
- Our professional sales team and engineers will provide various customized hotel furniture solution after we discuss about your project plan and your budget etc.
3.How long will it take to ship to my address?
- Generally, Production takes 35days. Shipping to US about 30 days. Can you offer more details so we can schedule your project on time?
4.What is the price?
- If you have shipping agent We can quote you product. If you would like us for to door price please share your room matrix and hotel address.
5.What’s your payment term?
-50% T/T in advance, the balance should be paid before loading. L/C and OA 30 days, 60 days, or 90 days payment terms will be accepted after audited by our financial department.other payment term client required can be negotiable.


 

 



  • Previous:
  • Next: